Document Search
Search for Documents
This website search function is your first port of call to find artefacts and documents for both Code and Design workstreams.
The search function for other libraries is in development.
For any further questions, please email [email protected]
Design Artefacts
Short Name | Doc Number | Sub Type | Status | Version |
---|---|---|---|---|
D-Flow and Interface Mapping | Unclassified | Approved | 1.2 | |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.8 |
ECS Reports - Internal | ERI011A | Interface Specifications | Approved | v5.1.1 |
Change of Supply - Reverse Migration | DEL-971 | Business Process Descriptions | Approved | v1.2 |
ADS Validation Estimation Method Statement (redlined) | METH002 | Method Statements | Approved | v5.4 |
D0225 - Priority Services Details | REC Solution Document | Approved | 1.0 | |
Data Collection Business Process Descriptions | BPD004 | Business Process Descriptions | Approved | v5.1 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.2 |
Data Service Requirements | BRS001 | Business Requirements | Approved | v5.4 |
D0215 - Provision of Site Technical Details | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Response Codes - json | E2E003 | Technical Design | Approved | v1.5.4 |
Change of Supply Business Process | BP001 | Business Process Diagrams | Approved | v5.0 |
Transition Design Tranche 2 Settlement Timetable Transition Comments Log | Unclassified | Approved | 1.0 | |
Disconnection Business Process (redlined) | BP007 | Business Process Diagrams | Approved | v5.3 |
D0402 - MHHS Supplier Half Hourly Demand Disconnection Report | BSC Solution Document | Approved | 1.0 | |
D0382 - Rejection Response for Request to LDSO for Site Technical Details | REC Solution Document | Approved | 1.0 | |
Change of Supply - Reverse Migration | DEL-971 | Unclassified | Approved | v1.1 |
Transition Design Consolidated Comments Log | DEL1222 | Unclassified | Draft | v1.1 |
Transitional Scaling Weights | DES240 | Unclassified | Draft | v0.1 |
MDS Method Statement (redlined) | METH007 | Method Statements | Approved | v5.4 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.4.1 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.5.4 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.6 |
D0193 - Confirmation of Key Meter Installation | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.7 |
Transition Approach and Parallel Running Requirements | BRS001 | Business Requirements | Approved | 3.0 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5 |
Physical interfaces - ECS Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
Change of Energisation Business Process Descriptions | BPD008 | Business Process Descriptions | Approved | v5.0 |
J2256 - MOP Flow Response Code | REC Solution Document | Approved | 1.0 | |
ADS Validation Estimation Method Statement (redlined) | METH002 | Method Statements | Approved | v5.2 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.6 |
Design Interim Release 7.2 Note | DEL1275 | Release Note | Approved | v1.0 |
Migration Design Document | DEL961 | Unclassified | Approved | v1.2 |
D0190 - Issue Customer Key | REC Solution Document | Approved | 1.0 | |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.2.1 |
Data Service Requirements (redlined) | BRS001 | Business Requirements | Approved | v5.5 |
End to End Non Functional Requirements | E2E002 | Technical Design | Approved | v3.3 |
Design Interim Release 3 Note | DEL1275 | Release Note | Approved | v1.0 |
D-Flow and Interface Mapping | DES196 | Unclassified | Draft | 0.4 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.2 |
Design Review Process Image | Unclassified | Approved | 1.0 | |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.4 |
Change of Service - Data Service - Forward Migration (redlined) | DEL964 | Business Process Diagrams | Approved | v1.3 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.5.5 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.5.1 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.3 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.4 |
Change of Meter Business Process (redlined) | BP009 | Business Process Diagrams | Approved | v5.1 |
Transfer of Reads - Change of Data Service Business Process (redlined) | BP003C | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.2 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Approved | v1.5 |
Change of Supply Business Process Descriptions | BPD001 | Business Process Descriptions | Approved | v5.0 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.3 |
Market-wide Data Service Requirements (ECS) | BRS008 | Business Requirements | Approved | v5.1 |
GSP Group Consumption Totals Report | MM00ccc - Dcccc | Unclassified | Draft | v0.5 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.4 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.4 |
Change of Supply - Reverse Migration (redlined) | DEL-965 | Business Process Diagrams | Approved | v1.2 |
ADS Validation Estimation Method Statement | METH002 | Method Statements | Approved | v5.4 |
Change of Service - Data Service - Forward Migration | DEL964 | Business Process Diagrams | Approved | V1.3 |
Change of Service - Metering Service - Forward Migration (redlined) | DEL963 | Business Process Diagrams | Approved | v1.4 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.7 |
D0401 - MHHS Aggregated Disconnected DUoS Report | BSC Solution Document | Approved | 1.0 | |
FFIEC Cyber Assessment Tool | DES141 | Supporting Document | Approved | v3.4 |
Data Processing Business Process (redlined) | BP005 | Business Process Diagrams | Approved | v5.1 |
Change of Registration Data Business Process Descriptions (redlined) | BPD010 | Business Process Descriptions | Approved | v5.1.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.2.1 |
Physical interfaces - ECS Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
EES and SDEP Requirements | BRS006 | Business Requirements | Approved | v5.0 |
Disconnection Business Process | BP007 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - ECS Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.5 |
D-Flow and Interface Mapping | DES196 | Unclassified | Approved | 0.3 |
D0191 - Request Special Visit to Read Reset Key Meter | REC Solution Document | Approved | 1.0 | |
MDS Method Statement (redlined) | METH007 | Method Statements | Approved | v5.1 |
Transition Approach and Parallel Running Requirements | BRS001 | Unclassified | Draft | v1.0 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
ADS Validation Estimation Method Statement | METH002 | Method Statements | Approved | v5.3 |
Change of Service - Metering Service Business Process (redlined) | BP002 | Business Process Diagrams | Approved | v5.4 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.5 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.5.3 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.3 |
D0224 - Notification of Programme for Re-Certification Meter Changes | REC Solution Document | Approved | 1.0 | |
IF-005 Use Case Guide (redlined) | DES229 | Supporting Document | Approved | v1.2 |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.7.2 |
Supplier BM Unit Report | Unclassified | Draft | 0.6 | |
SDS Validation Estimation Method Statement | METH001 | Method Statements | Approved | v5.2 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.4 |
Physical interfaces - ECS Common Blocks - json | E2E003 | Technical Design | Approved | v1.7.2 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Approved | v1.5 |
D-Flow and Interface Mapping | DES196 | Unclassified | Draft | 1.0 |
Volume Allocation Service Business Process (redlined) | BP020 | Business Process Diagrams | Approved | v5.1 |
Data Collection Business Process | BP004 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.3 |
ECS Reports - External | ERI011B | Interface Specifications | Approved | v5.6.1 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
Physical interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.4 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5 |
Change of Service - Metering Service - Forward Migration | DEL969 | Business Process Descriptions | Approved | v1.2 |
Operational Choreography (redlined) | OPC001 | Method Statements | Approved | v5.3 |
Change of Service - Data Service Business Process | BP003 | Business Process Diagrams | Approved | v5.4 |
Demand Disconnection Event Business Process Descriptions | BPD013 | Business Process Descriptions | Approved | v5.1 |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.7.1 |
D0169 - Allocation of New Additional MPAN Cores | REC Solution Document | Approved | 1.0 | |
MDS Method Statement | METH007 | Method Statements | Approved | v5.4 |
Metering Service Requirements | BRS002 | Business Requirements | Approved | v5.1 |
D0139 Pre Transition Release | REC Solution Document | Approved | v1.1 | |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
Market-wide Data Service Business Process Descriptions | BPD019 | Business Process Descriptions | Approved | v5.1 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.5 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
Annual Consumption Method Statement (redlined) | METH010 | Method Statements | Approved | v5.2 |
D0135 - Asset Condition Report | REC Solution Document | Approved | 1.0 | |
J0007 - Requested Action Code | REC Solution Document | Approved | 1.0 | |
ADS Validation Estimation Method Statement (redlined) | METH002 | Method Statements | Approved | v5.3 |
Data Processing Business Process | BP005 | Business Process Diagrams | Approved | v5.1 |
Change of Registration Data Business Process (redlined) | BP010 | Business Process Diagrams | Approved | v5.4 |
Market-wide Data Service Requirements (ECS) (redlined) | BRS008 | Business Requirements | Approved | v5.1 |
Change of Service - Data Service - Reverse Migration | DEL973 | Unclassified | Approved | v1.0 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.3 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.5 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.5 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.7 |
Change of Supply - Reverse Migration (redlined) | DEL-971 | Business Process Descriptions | Approved | v1.2 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.3 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.7 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.6.1 |
Volume Allocation Service Business Process Descriptions | BPD020 | Business Process Descriptions | Approved | v5.1.1 |
Physical interfaces - Interfaces - yaml | E2E003 | Unclassified | Approved | v1.2.3 |
Physical interfaces - Data Types - json | E2E003 | Unclassified | Approved | V1.2.3 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.1 |
UMSDS EM Function Method Statement (redlined) | METH004 | Method Statements | Approved | v5.3 |
Change of Metering Service Business Process Descriptions (redlined) | BPD002 | Business Process Descriptions | Approved | v5.1 |
UMSO Method Statement | METH009 | Method Statements | Approved | v5.1 |
UMSDS EM Functions Method Statement | METH004 | Method Statements | Approved | v5.1 |
Change of Service - Data Service - Forward Migration (redlined) | DEL964 | Business Process Diagrams | Approved | V1.4 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.6 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.2.1 |
Metering Service Requirements | BRS002 | Business Requirements | Approved | v5.4 |
Physical Interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.7.2 |
Volume Allocation Service Requirements (ECS) | BRS009 | Business Requirements | Approved | v5.0 |
End to End Non Functional Requirements | E2E002 | Technical Design | Approved | v3.2 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.5 |
DDE Method Statement | METH008 | Method Statements | Approved | v5.0 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.1 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.2 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.2.2 |
Annual Consumption Method Statement (redlined) | METH010 | Method Statements | Published to Public | v5.1 |
D0268 - Advanced Meter Technical Details | REC Solution Document | Approved | 1.0 | |
D0221 - Notification of Failure to Install or Energise Metering System | REC Solution Document | Approved | 1.0 | |
Data Service Requirements (redlined) | BRS001 | Business Requirements | Approved | v5.3 |
Design Assurance Questions - Excel Version | DEL-1153 | Unclassified | Approved | v1.1 |
CSS and DCC Update Business Process | BP003A | Business Process Diagrams | Approved | v5.0 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.5.1 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.5 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.5.5 |
D0311 Pre Transition Release | REC Solution Document | Approved | V1.1 | |
ECS Reports - Internal | ERI011A | Interface Specifications | Approved | v5.4 |
MHHS Q&A Post-M5 Design Change Control & Engagement | Unclassified | Published to Public | 0.3 | |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.6 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.2.1 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.6.1 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.2 |
Design Interim Release 4 Note | DEL1275 | Release Note | Approved | v1.0 |
D0383 - Notification of Commissioning Information | REC Solution Document | Approved | 1.0 | |
Design Issue Notification Log | DEL976 | Approved | 1.1 | |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.5.3 |
D0400 - MHHS Supplier BM Unit Report | D0400 | BSC Solution Document | Approved | 1.3 |
New Data Items | BSC Solution Document | Approved | 1.0 | |
Physical interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.5.3 |
Industry Standing Data (ECS) Business Process | BP021 | Business Process Diagrams | Approved | v5.1 |
UMSO Method Statement (redlined) | METH009 | Method Statements | Approved | v5.1 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.4 |
J0107 - Rejection Reason Code | BSC Solution Document | Approved | 1.0 | |
Change of Service - Data Service - Forward Migration | DEL964 | Business Process Diagrams | Approved | v1.2 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.2.1 |
Migration Design Document | DEL961 | Supporting Document | Approved | v1.3 |
Change of Energisation Business Process | BP008 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.5.5 |
Physical interfaces - Response Codes - yaml | E2E003 | Technical Design | Approved | v1.7 |
Physical interfaces - Interfaces - yaml | E2E003 | Unclassified | Approved | v1.1 |
D0180 - Request to Energise De-Energise Shut Down Prepayment Meter | REC Solution Document | Approved | 1.0 | |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.7.1 |
Change of Registration Data Business Process Descriptions (redlined) | BPD010 | Business Process Descriptions | Approved | v5.2 |
Metering Service Requirements (redlined) | BRS002 | Business Requirements | Approved | v5.6 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.7 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.5.5 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.5 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Unclassified | Approved | v1.1 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.7 |
Physical interfaces - Real Common Blocks - json | E2E003 | Unclassified | Approved | v1.2.3 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.7.2 |
MDS Method Statement | METH007 | Method Statements | Approved | v5.0 |
Change of Meter Business Process (redlined) | BP009 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.5 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.2 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.6 |
Market-wide Data Service (ECS) Business Process (redlined) | BP019 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.4 |
Supplier Half Hourly Demand Report | MM00aaa - Daaaa | Unclassified | Draft | v0.5 |
ECS Reports - External | ERI011B | Interface Specifications | Approved | v5.4 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.7.2 |
Annual Consumption Requirements | BRS012 | Business Requirements | Approved | v5.0 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.7 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.5 |
Change of Registration Data Business Process (redlined) | BP010 | Business Process Diagrams | Approved | v5.2 |
Master Settlement Timetable Example Replacement | Approved | 2.0 | ||
Industry Standing Data Requirements (ECS) | BRS010 | Business Requirements | Approved | v5.0 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.2.1 |
Optional SDS MDR Standard Interactions Requirements | BRS017 | Business Requirements | Approved | v1.0 |
Release Management Implementation | Unclassified | Draft | 0.3 | |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.5.5 |
D0302 - Notification of Customer Details | REC Solution Document | Approved | 1.0 | |
Change of Meter Business Process (redlined) | BP009 | Business Process Diagrams | Approved | v5.4 |
Physical interfaces - Response Codes - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.1 |
End to End Security Requirements | DIP005 | Security Design | Approved | v1.4 |
Traceability Matrix | DES203 | Supporting Document | Approved | v5.1 |
Change of Registration Data Business Process (redlined) | BP010 | Business Process Diagrams | Approved | v5.4 |
D0401 - MHHS Aggregated Disconnected DUoS Report | D0401 | BSC Solution Document | Approved | 1.1 |
Migration Design Document | DEL961 | Unclassified | Approved | v1.0 |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Approved | v1.7 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.3.2 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.4 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.7 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.6.1 |
Registration Service Requirements (redlined) | BRS003 | Business Requirements | Approved | v5.6 |
Transitional BMU Aggregated Data | DES242 | Interface Specifications | Approved | 1.0 |
Change of Data Service Business Process Descriptions | BPD003 | Business Process Descriptions | Approved | v5.1 |
D0126 - Pre Transition Release | REC Solution Document | Approved | V1.1 | |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.3 |
Load Shaping Service Business Process Descriptions | BPD018 | Business Process Descriptions | Approved | v5.0 |
Annual Consumption Requirements (redlined) | BRS012 | Business Requirements | Approved | v5.1 |
Data Processing Business Process | BP005 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - ECS Common Blocks - json | E2E003 | Technical Design | Approved | v1.8 |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.4 |
MDS Method Statement | METH007 | Method Statements | Approved | v5.2 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.5.4 |
Change of Service - Metering Service Business Process | BP002 | Business Process Diagrams | Approved | v5.3 |
ECS Reports - Internal | ERI011A | Interface Specifications | Approved | v5.5 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.2 |
End to End Security Requirements | DIP005 | Security Design | Approved | v1.4 |
Transition Approach and Parallel Running Requirements (redlined) | MHHSP-TRANS - BRS001 | Business Requirements | Approved | v4.0 |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.6.1 |
Annual Consumption Method Statement | METH010 | Method Statements | Approved | v5.0 |
Transfer of Reads Business Process Descriptions | BPD003C | Business Process Descriptions | Approved | v5.1 |
Data Service Requirements (redlined) | BRS001 | Business Requirements | Approved | v5.2 |
Change of Meter Business Process | BP009 | Business Process Diagrams | Approved | v5.3 |
Migration Design Timeline | DEL977 | Unclassified | Approved | v1.1 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.6 |
Change of Registration Data Business Process (redlined) | BP010 | Business Process Diagrams | Approved | v5.1.1 |
Physical interfaces - Submit Events - yaml | E2E003 | Unclassified | Approved | v1.1 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.6.1 |
Data Processing Business Process Descriptions | BPD005 | Business Process Descriptions | Approved | v5.1 |
DTN Flow Consultation Consolidated Comments Log | Unclassified | Draft | 1.0 | |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.5 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.6 |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.8.1 |
Industry Standing Data Business Process Descriptions | BPD021 | Business Process Descriptions | Approved | v5.0 |
ISD Entities | EDI021 | Supporting Document | Approved | v5.5.1 |
ECS Reports - Internal (redlined) | ERI011A | Interface Specifications | Approved | v5.2 |
Change of Energisation Business Process | BP008 | Business Process Diagrams | Approved | v5.0 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.7 |
Registration Service Requirements (redlined) | BRS003 | Business Requirements | Approved | v5.5 |
Migration Design Requirements Log (redlined) | DEL974 | Business Requirements | Approved | v1.1 |
ISD Entities | EDI021 | Supporting Document | Approved | v5.3 |
LDSO Overview Requirements (redlined) | BRS005 | Business Requirements | Approved | v5.2 |
Transition Design Artefacts Comments Log | DES246 | Unclassified | Draft | v1.0 |
D0400 - MHHS Supplier BM Unit Report | BSC Solution Document | Approved | 1.2 | |
ISD Entities | EDI021 | Supporting Document | Approved | v5.6 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.2.1 |
Baselined Artefacts Diagram | Approved | 1.0 | ||
Master Settlement Timetable Example | Approved | 2.0 | ||
Change of Service - Data Service - Forward Migration (redlined) | DEL964 | Business Process Diagrams | Approved | v1.2 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.4 |
Registration Service Requirements (redlined) | BRS003 | Unclassified | Approved | v5.4 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.3 |
Data Flow Changes Summary | REC Solution Document | Approved | 1.0 | |
Transitional BMU Aggregated Data | DES242 | Unclassified | Draft | v0.1 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.7 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5 |
VAS Method Statement (redlined) | METH006 | Method Statements | Approved | v5.1 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.2 |
Load Shaping Service (ECS) Business Process | BP018 | Business Process Diagrams | Approved | v5.0 |
Volume Allocation Service Business Process Descriptions (redlined) | BPD020 | Business Process Descriptions | Approved | v5.1.1 |
End to End Security Architecture | DIP003 | Technical Design | Approved | v1.2 |
Physical interfaces - ECS Common Blocks - json | E2E003 | Technical Design | Approved | v1.7 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.2.3 |
ECS Reports - External | ERI011B | Interface Specifications | Approved | v5.6 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.2.2 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
Change of Metering Business Process Descriptions (redlined) | BPD009 | Business Process Descriptions | Approved | v5.3 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.1 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.5.4 |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.2.2 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.8 |
Registration Service Requirements (redlined) | BRS003 | Business Requirements | Approved | v5.3 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.5 |
Change of Service - Metering Service - Reverse Migration | DEL-972 | Unclassified | Approved | v1.0 |
Change of Service - Metering Service Business Process | BP002 | Business Process Diagrams | Approved | v5.2 |
Operational Choreography (redlined) | OPC001 | Method Statements | Approved | v5.1 |
Consumption Amendment Business Process Descriptions | BPD016 | Business Process Descriptions | Approved | v5.0 |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Approved | v1.7.1 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.5 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.2.1 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.5.2 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.5.3 |
Design Interim Release 7 Note | DEL1275 | Release Note | Approved | v1.0 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.2 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.4 |
Change of Connection Type and/or Market Segment Business Process Descriptions | BPD011 | Business Process Descriptions | Approved | v5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.4 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.7.2 |
Physical interfaces - Response Codes - json | E2E003 | Technical Design | Approved | v1.7 |
Design Interim Release 5.5 Note | DEL1275 | Release Note | Approved | v1.0 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.2 |
Change of Supply - Forward Migration | DEL-962 | Unclassified | Approved | v1.0 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.5.3 |
Change Of Service - Metering Service Business Process (redlined) | BP002 | Business Process Diagrams | Approved | V5.2 |
Data Service Requirements (redlined) | BRS001 | Business Requirements | Approved | v5.4 |
Change of Meter Business Process (redlined) | BP009 | Business Process Diagrams | Approved | v5.3 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.2 |
VAS Method Statement | METH006 | Method Statements | Approved | v5.0 |
Design Interim Release 2.3 Note | DEL1275 | Release Note | Approved | v1.0 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Approved | v1.8 |
Design Interim Release 5 Note | DEL1275 | Release Note | Approved | v1.0 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.6 |
Change of Connection Type and/or Market Segment Business Process (redlined) | BP011 | Business Process Diagrams | Approved | v5.2 |
IF-005 Use Case Guide (redlined) | DES229 | Supporting Document | Approved | v1.1.2 |
Physical interfaces - Interfaces - json | E2E003 | Unclassified | Approved | v1.2.3 |
Registration Service Requirements | BRS003 | Business Requirements | Approved | v5.1.2 |
Change of Supply - Reverse Migration | DEL-971 | Unclassified | Approved | v1.0 |
Change of Registration Data Business Process | BP010 | Business Process Diagrams | Approved | v5.1.1 |
End to End Non Functional Requirements (redlined) | E2E002 | Technical Design | Approved | v3.2 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.8 |
Data Catalogue | Unclassified | Draft | 5.2.1 | |
D0399 - MHHS GSP Group Consumption Totals Report | BSC Solution Document | Approved | 1.1 | |
Change of Service - Metering Service - Forward Migration | DEL963 | Business Process Diagrams | Approved | v1.2 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.3 |
D0239 - Revenue Protection Report on Action Taken | REC Solution Document | Approved | 1.0 | |
UMSDS EM Functions Method Statement | METH004 | Method Statements | Approved | v5.3 |
Supplier Overview Requirements | BRS004 | Business Requirements | Approved | v5.3 |
Transfer of Reads - Change of Data Service Business Process | BP003C | Business Process Diagrams | Approved | v5.2 |
Change of Service - Metering Service Business Process | BP002 | Business Process Diagrams | Approved | v5.4 |
Migration Design Assurance Review Timeline | DEL977 | Unclassified | Published to Public | 0.1 |
Annual Consumption Requirements | BRS012 | Business Requirements | Approved | v5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.7.2 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.2.1 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
Linked and Related MPANs Explainer | DEL-1058 | Supporting Document | Approved | v2.0 |
Transfer of Reads - Change of Data Service Business Process | BP003C | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Submit Events - yaml | E2E003 | Unclassified | Approved | v1.1 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Approved | v1.7 |
D0142 - Request for Installation or Change to a Metering System Functionality or Removal of All Meters | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.7.2 |
Functional Specification | DIP001 | Technical Design | Approved | v2.3 |
Physical interfaces - Submit Events - json | E2E003 | Unclassified | Approved | v1.1 |
Disconnection Business Process Descriptions | BPD007 | Business Process Descriptions | Approved | v5.2 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
D0149 - Notification of Mapping Details | REC Solution Document | Approved | 1.0 | |
Design Change Control | DEL916 | Unclassified | Approved | v1.0 |
LDSO Network Operations Session Recording | Draft | 1 | ||
Change of Metering Business Process Descriptions | BPD009 | Business Process Descriptions | Approved | v5.0 |
Change of Service - Data Service Business Process | BP003 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - Interfaces - json | E2E003 | Unclassified | Approved | v1.1 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.3 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.6 |
Operational Choreography (redlined) | OPC001 | Method Statements | Approved | v5.2.6 |
Design Change Control Process | Unclassified | Published to Public | 0.2 | |
Change of Connection Type and/or Market Segment Business Process Descriptions | BPD011 | Business Process Descriptions | Approved | v5.2 |
D0300 Pre Transition Release | REC Solution Document | Approved | V1.1 | |
Disconnection Business Process Descriptions (redlined) | BPD007 | Business Process Descriptions | Approved | v5.1.1 |
VAS Method Statement | METH006 | Method Statements | Approved | v5.2 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.2.2 |
Change of Energisation Business Process (redlined) | BP008 | Business Process Diagrams | Approved | v5.1 |
D-Flow and Interface Mapping | DES196 | Unclassified | Approved | 1.1 |
End to End Non Functional Requirements | E2E002 | Technical Design | Approved | v3.1 |
Amended Design Artefacts Comments Log | DEL1167 | Unclassified | Approved | v1 |
D0216 - Request Installation of Token Meter | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Data Catalogue - json | E2E003 | Unclassified | Approved | v1.1 |
UMSDS EM Functions Method Statement | METH004 | Method Statements | Approved | v5.2 |
D0176 - Request Tariff Debt Change on Token Meter | REC Solution Document | Approved | 1.0 | |
SDS Validation Estimation Method Statement (redlined) | METH001 | Method Statements | Approved | v5.2 |
Supplier Overview Requirements (redlined) | BRS004 | Business Requirements | Approved | v5.2 |
Volume Allocation Service Business Process Descriptions | BPD020 | Business Process Descriptions | Approved | v5.2 |
ADS Validation Estimation Method Statement (redlined) | METH002 | Method Statements | Approved | v5.1 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.1 |
Transfer of Reads Business Process Descriptions (redlined) | BPD003C | Business Process Descriptions | Approved | v5.1 |
EES and SDEP Requirements | BRS006 | Business Requirements | Approved | v5.1 |
Provisional Transitional Scaling Weights | DES240 | Supporting Document | Approved | v1.1 |
Change of Service - Data Service Business Process | BP003 | Business Process Diagrams | Approved | v5.7 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
Operational Choreography | OPC001 | Method Statements | Approved | v5.1 |
Metering Service Requirements (redlined) | BRS002 | Business Requirements | Approved | v5.2 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.5.4 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.2 |
Supplier Half Hourly Demand Report | Unclassified | Draft | 0.6 | |
Traceability Matrix (redlined) | DES203 | Supporting Document | Approved | v5.1 |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Approved | v1.5 |
Change of Service - Metering Service Business Process (redlined) | BP002 | Business Process Diagrams | Approved | v5.1 |
Operational Choreography | OPC001 | Method Statements | Approved | v5.4 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.1 |
Change of Supply - Reverse Migration (redlined) | DEL-971 | Unclassified | Approved | v1.1 |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.5 |
Migration Design Document (redlined) | DEL961 | Unclassified | Approved | v1.2 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.6 |
Industry Standing Data Requirements (ECS) (redlined) | BRS010 | Business Requirements | Approved | v5.1 |
Data Catalogue | DEL1510 | Unclassified | Draft | v5.2.1 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.3 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.6 |
Industry Standing Data (ECS) Business Process (redlined) | BP021 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.2.3 |
Transfer of Reads - Change of Data Service Business Process (redlined) | BP003C | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.2 |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Approved | v1.7.2 |
Metering Service Requirements | BRS002 | Business Requirements | Approved | v5.6 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.7.1 |
Physical interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.5.1 |
Supplier Overview Requirements | BRS004 | Business Requirements | Approved | v5.0 |
Provisional Transitional Scaling Weights | DES240 | Supporting Document | Approved | 1.0 |
Physical interfaces - Submit Events - yaml | E2E003 | Unclassified | Approved | v1.2.3 |
LSS Method Statement (redlined) | METH005 | Method Statements | Approved | v5.1 |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.4 |
DTN Flow Consultation Comments Log | Approved | 1.0 | ||
Data Processing Business Process Descriptions (redlined) | BPD005 | Business Process Descriptions | Approved | v5.1 |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.5.1 |
Change of Metering Business Process Descriptions | BPD009 | Business Process Descriptions | Approved | v5.3 |
Change of Supply - Reverse Migration (redlined) | DEL-965 | Unclassified | Approved | v1.1 |
D0170 - Request for Metering System Related Details | REC Solution Document | Approved | 1.0 | |
SDS Validation Estimation Method Statement | METH001 | Method Statements | Approved | v5.3 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.3 |
Physical interfaces - Submit Events - yaml | E2E003 | Unclassified | Approved | v1.2.3 |
Traceability Matrix | DES203 | Supporting Document | Approved | v5.0 |
UMSDS EM Function Method Statement (redlined) | METH004 | Method Statements | Approved | v5.2 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.5.2 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.2 |
DEL1712 - MHHS Impacts to BSC owned Data Flows | BSC Solution Document | Approved | 1.1 | |
Design Interim Release 5.3 Note | DEL1275 | Release Note | Approved | v1.0 |
Change of Service - Metering Service - Reverse Migration | DEL-966 | Unclassified | Approved | v1.0 |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.5.2 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.1 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.5.1 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.2 |
Design Interim Release 5.4 Note | DEL1275 | Release Note | Approved | v1.0 |
VAS Method Statement | METH006 | Method Statements | Approved | v5.3 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.2.1 |
D0150 Pre Transition Release | REC Solution Document | Approved | v1.1 | |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.2 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.3 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.3 |
Data Processing Business Process (redlined) | BP005 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.6 |
VAS Method Statement (redlined) | METH006 | Method Statements | Approved | v5.2 |
Data Collection Business Process Descriptions | BPD004 | Business Process Descriptions | Approved | v5.0 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.4 |
SDS Validation Estimation Method Statement (redlined) | METH001 | Method Statements | Approved | v5.3 |
Functional Specification | DIP001 | Technical Design | Awaiting Approval | v2.0 |
D0202 - Readings and Settings from a Removed Smart Card Meter | REC Solution Document | Approved | 1.0 | |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.1.2 |
ECS Registration Data Archive Requirements | BRS014 | Business Requirements | Approved | v5.0 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.5 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.5.1 |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.5.4 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.5.3 |
MDS Method Statement (redlined) | METH007 | Method Statements | Approved | v5.3 |
D0398 - MHHS Supplier Settlement Header Report | BSC Solution Document | Approved | 1.1 | |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.7 |
Metering Service Requirements (redlined) | BRS002 | Business Requirements | Approved | v5.1 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.7.1 |
LSS Method Statement | METH005 | Method Statements | Approved | v5.1 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.5.2 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.5.4 |
D0304 - Notification of Meter Asset Provider | REC Solution Document | Approved | 1.0 | |
D0384 - Notification of Commissioning Status | REC Solution Document | Approved | 1.0 | |
Registration Service Requirements | BRS003 | Business Requirements | Approved | v5.3 |
ISD Entities | EDI021 | Supporting Document | Approved | v5.1 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.6 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.8 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.8.1 |
D0168 - Request for Additional New MPAN Cores | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.5 |
Supplier Overview Requirements (redlined) | BRS004 | Business Requirements | Approved | v5.3 |
D0404 - MHHS Supplier BM Unit Demand Disconnection Report | D0404 | BSC Solution Document | Approved | 1.1 |
D0303 Pre Transition Release | REC Solution Document | Approved | 1.2 | |
ECS Reports - Internal (redlined) | ERI011A | Interface Specifications | Approved | v5.1.1 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.2.1 |
Market-wide Data Service Requirements (ECS) | BRS008 | Business Requirements | Approved | v5.0 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.5.5 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
Demand Disconnection Event Business Process Descriptions | BPD013 | Business Process Descriptions | Approved | v5.0 |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.2 |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Approved | v1.5 |
Change of Registration Data Business Process (redlined) | BP010 | Business Process Diagrams | Approved | v5.3 |
Migration Design Document (redlined) | DEL961 | Unclassified | Approved | v1.1 |
Industry Standing Data Business Process Descriptions (redlined) | BPD021 | Business Process Descriptions | Approved | v5.1 |
Registration Service Requirements (redlined) | BRS003 | Business Requirements | Approved | v5.1.2 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.3 |
Data Collection Business Process (redlined) | BP004 | Business Process Diagrams | Approved | v5.1 |
Annual Consumption Method Statement | METH010 | Method Statements | Approved | v5.2 |
Volume Allocation Service Business Process (redlined) | BP020 | Business Process Diagrams | Approved | v5.2 |
Data Service Requirements | BRS001 | Business Requirements | Approved | v5.5 |
Transition to new Settlement Timetable | Approved | 2.0 | ||
Change of Service - Data Service Business Process | BP003 | Business Process Diagrams | Approved | v5.6.1 |
End to End Solution Architecture | E2E001 | Technical Design | Approved | v3.5.2 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.2 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.2.1 |
D0178 - Confirmation of Token Meter Installation | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.3 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.6 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.4 |
ECS Reports - Internal (redlined) | ERI011A | Interface Specifications | Approved | v5.5 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.5.2 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.7.1 |
Physical interfaces - ECS Common Blocks - json | E2E003 | Technical Design | Approved | v1.7.1 |
Change of Metering Service Business Process Descriptions (redlined) | BPD002 | Business Process Descriptions | Approved | v5.2 |
Change of Meter Business Process | BP009 | Business Process Diagrams | Approved | v5.1 |
Supplier Overview Requirements (redlined) | BRS004 | Business Requirements | Approved | v5.4 |
Change of Service - Data Service - Reverse Migration | DEL967 | Unclassified | Approved | v1.0 |
Migration Design Requirements Log | DEL974 | Business Requirements | Approved | v1.1 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
Change of Service - Data Service Business Process (redlined) | BP003 | Business Process Diagrams | Approved | v5.7 |
Design Interim Release 7.1 Note | DEL1275 | Release Note | Approved | v1.0 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.5.5 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.2.1 |
Change of Supply Business Process Descriptions (redlined) | BPD001 | Business Process Descriptions | Approved | v5.1 |
Optional SDS MDR Standard Interactions | BP017 | Business Process Diagrams | Approved | v1.0 |
Design Interim Release 5.1 Note | DEL1275 | Release Note | Approved | v1.0 |
Transition Design Tranche 2 Comments Log | Draft | 0.1 | ||
Change of Connection Type and/or Market Segment Business Process Descriptions (redlined) | BPD011 | Business Process Descriptions | Approved | v5.1 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.5.5 |
Registration Service Requirements (redlined) | BRS003 | Business Requirements | Approved | v5.2 |
Change of Service - Metering Service - Forward Migration (redlined) | DEL963 | Business Process Diagrams | Approved | v1.1 |
VAS Method Statement (redlined) | METH006 | Method Statements | Approved | v5.3 |
ECS Reports - Internal (redlined) | ERI011A | Interface Specifications | Approved | v5.3 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Approved | v1.7 |
D0134 - Request to Change Energisation Satus | D0134 | REC Solution Document | Approved | 1.0 |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.5.2 |
Load Shaping Service Requirements (ECS) | BRS007 | Business Requirements | Approved | v5.0 |
Disconnection Business Process Descriptions (redlined) | BPD007 | Business Process Descriptions | Approved | v5.2 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.4 |
Registration Service requirements | BRS003 | Business Requirements | Approved | v5.5 |
Design Interim Release 2 Note | DEL1275 | Release Note | Approved | v1.0 |
SDS Validation Estimation Method Statement | METH001 | Method Statements | Approved | v5.1 |
MDS Method Statement (redlined) | METH007 | Method Statements | Approved | v5.2 |
UMSO Method Statement | METH009 | Method Statements | Approved | v5.2 |
Change of Service - Data Service - Forward Migration (redlined) | DEL964 | Business Process Diagrams | Approved | v1.1 |
ISD Entity Map | EM021 | Supporting Document | Approved | v5.0 |
Change of Connection Type and/or Market Segment Business Process (redlined) | BP011 | Business Process Diagrams | Approved | v5.1.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.3 |
J0171 - Reading Type | REC Solution Document | Approved | 1.0 | |
Change of Connection Type and/or Market Segment Business Process (redlined) | BP011 | Business Process Diagrams | Approved | v5.4 |
Change of Meter Business Process | BP009 | Business Process Diagrams | Approved | v5.4 |
End to End Solution Architecture (red-lined) | E2E001 | Technical Design | Approved | v3.1.1 |
Design Interim Release 8 Note | DEL1275 | Release Note | Approved | v1.0 |
MHHS Impacts to BSC D-Flows Consolidated Comments Log | Unclassified | Draft | 1.0 | |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.4 |
Physical Interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.2 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | V1.2.3 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Submit Events - json | E2E003 | Unclassified | Approved | v1.1 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.3 |
Data Processing Business Process Descriptions | BPD005 | Business Process Descriptions | Approved | v5.0 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.5.3 |
GSP Group Consumption Totals Report | Unclassified | Draft | 0.6 | |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.5 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.8 |
Design Interim Release 2.1 Note | DEL1275 | Release Note | Approved | v1.0 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.6 |
LDSO Overview Requirements (redlined) | BRS005 | Business Requirements | Approved | v5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.6 |
Change of Service - Metering Service - Forward Migration (redlined) | DEL963 | Business Process Diagrams | Approved | v1.3 |
Change of Supply - Reverse Migration | DEL-965 | Unclassified | Approved | v1.0 |
Change of Supply Business Process (redlined) | BP001 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.7 |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.5.3 |
Metering Service Requirements (redlined) | BRS002 | Business Requirements | Approved | v5.3 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
D0223 - Request to Install Check Meter or Carry Out Accuracy Tests | REC Solution Document | Approved | 1.0 | |
IF015-016 Design Note (redlined) | DIP051 | Technical Design | Approved | v0.2 |
Physical interfaces - ECS Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.7 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.6 |
D-Flow and Interface Mapping | DES196 | Unclassified | Approved | v1.1 |
CSS and DCC Update Business Process Descriptions | BPD003A | Business Process Descriptions | Approved | v5.0 |
Change of Metering Service Business Process Descriptions | BPD002 | Business Process Descriptions | Approved | v5.2 |
Supplier Overview Requirements (redlined) | BRS004 | Business Requirements | Approved | v5.1 |
Demand Disconnection Event Requirements (ECS) | BRS013 | Business Requirements | Approved | v5.0 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.3 |
LDSO Overview Requirements | BRS005 | Business Requirements | Approved | v5.2 |
Transition Design Consolidated Comments Log | DEL1222 | Unclassified | Approved | 1.2 |
ECS Reports - Internal (redlined) | ERI011A | Interface Specifications | Approved | v5.4 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.2.1 |
Change of Service - Data Service - Reverse Migration (redlined) | DEL967 | Unclassified | Approved | v1.1 |
Physical interfaces - Data Types - json | E2E003 | Unclassified | Approved | v1.1 |
Change of Service - Data Service - Forward Migration (redlined) | DEL970 | Business Process Descriptions | Approved | v1.1 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.5.2 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
IF-005 Use Case Guide (redlined) | DES229 | Supporting Document | Approved | v1.3 |
Demand Disconnection Event (ECS) Business Process | BP013 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.2 |
D0404 - MHHS Supplier BM Unit Demand Disconnection Report | BSC Solution Document | Approved | 1.0 | |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.3 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.5 |
Industry Standing Data (ECS) Business Process | BP021 | Business Process Diagrams | Approved | v5.0 |
Supplier Overview Requirements | BRS004 | Business Requirements | Approved | v5.4 |
ECS Reports - External (redlined) | ERI011B | Interface Specifications | Approved | v5.1 |
Design Interim Release 6 Note | DEL1275 | Release Note | Approved | v1.0 |
Demand Disconnection Event (ECS) Business Process | BP013 | Business Process Diagrams | Approved | v5.0 |
D0398 - MHHS Supplier Settlement Header Report | D0398 | BSC Solution Document | Approved | 1.1 |
Design Interim Release 5.2 Note | DEL1275 | Release Note | Approved | v1.0 |
DTN Flow Release Note | Unclassified | Approved | 1.0 | |
Data Service Requirements | BRS001 | Business Requirements | Approved | v5.2 |
Market-wide Data Service (ECS) Business Process | BP019 | Business Process Diagrams | Approved | v5.0 |
Change of Service - Metering Service - Forward Migration (redlined) | DEL969 | Business Process Descriptions | Approved | v1.1 |
Change of Service - Metering Service - Forward Migration | DEL963 | Business Process Diagrams | Approved | v1.3 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.7.1 |
Market-wide Data Service (ECS) Business Process | BP019 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Submit Events - json | E2E003 | Unclassified | Approved | v1.2.3 |
Demand Disconnection Event (ECS) Business Process (redlined) | BP013 | Business Process Diagrams | Approved | v5.1 |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.3 |
Change of Registration Data Business Process Descriptions | BPD010 | Business Process Descriptions | Approved | v5.2 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
Physical interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.5.1 |
MDS Method Statement | METH007 | Method Statements | Approved | v5.3 |
Change of Service - Metering Service - Forward Migration (redlined) | DEL963 | Business Process Diagrams | Approved | v1.2 |
Transition Design Tranche 2 Comments Log | Approved | 1.0 | ||
Migration Design Artefacts Comments | DEL980 | Unclassified | Approved | 0.1 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.4 |
Switch Meter Read Exceptions | REC Solution Document | Approved | 1.0 | |
Optional SDS MDR Standard Interactions (redlined) | BP017 | Business Process Diagrams | Approved | v1.0 |
Logical Data Model | DES052 | Supporting Document | Approved | v5.0 |
UMSDS EM Functions Method Statement (redlined) | METH004 | Method Statements | Approved | v5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.2.2 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Approved | v1.7.2 |
J2255 - MPAS D0304 Response Code | REC Solution Document | Approved | 1.0 | |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.5.2 |
Functional Non-Functional Requirements | DIP002 | Technical Design | Approved | v2.2 |
Migration Design Document | DEL961 | Unclassified | Approved | v1.1 |
D0402 - MHHS Supplier Half Hourly Demand Disconnection Report | D0402 | BSC Solution Document | Approved | 1.1 |
Physical interfaces - Examples | E2E003 | Technical Design | Approved | v0.6 |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.3 |
Consumption Amendment Business Process | BP016 | Business Process Diagrams | Approved | v5.0 |
Physical interfaces - Submit Events - json | E2E003 | Unclassified | Approved | v1.2.3 |
Migration Design Requirements Log | DEL974 | Unclassified | Approved | v1.0 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.7 |
Volume Allocation Service Business Process Descriptions (redlined) | BPD020 | Business Process Descriptions | Approved | v5.2 |
Change of Connection Type and/or Market Segment Business Process | BP011 | Business Process Diagrams | Approved | v5.2 |
Operational Choreography (redlined) | OPC001 | Method Statements | Approved | v5.4 |
Replacement RF Settlement Timetable | Approved | 2.0 | ||
ECS Reports - External | ERI011B | Interface Specifications | Approved | v5.1 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.5.1 |
Disconnection Business Process (redlined) | BP007 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.1 |
Transition Approach and Parallel Running Requirements | MHHSP-TRANS - BRS001 | Business Requirements | Approved | v4.0 |
Disconnection Business Process (redlined) | BP007 | Business Process Diagrams | Approved | v5.1.1 |
Interface Catalogue | DES138 | Interface Specifications | Approved | v5.5.2 |
EES and SDEP Requirements (redlined) | BRS006 | Business Requirements | Approved | v5.1 |
Change of Connection Type and/or Market Segment Business Process Descriptions (redlined) | BPD011 | Business Process Descriptions | Approved | v5.2 |
Change of Supply Business Process | BP001 | Business Process Diagrams | Approved | v5.1 |
D0136 - Report to Supplier of Possible Irregularity | REC Solution Document | Approved | 1.0 | |
End to End Solution Architecture (redlined) | E2E001 | Technical Design | Approved | v3.2 |
Physical interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.5.2 |
Volume Allocation Service Business Process | BP020 | Business Process Diagrams | Approved | v5.1 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.5.4 |
Change of Connection Type and/or Market Segment Business Process | BP011 | Business Process Diagrams | Approved | v5.4 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.5.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.3 |
Design Review Process Timeline | Unclassified | Draft | 1 | |
Physical interfaces - Interfaces - json | E2E003 | Technical Design | Approved | v1.2.1 |
Change of Service - Metering Service - Forward Migration (redlined) | DEL969 | Business Process Descriptions | Approved | v1.2 |
Design Interim Release 2.2 Note | DEL1275 | Release Note | Approved | v1.0 |
Physical interfaces - Data Types - yaml | E2E003 | Technical Design | Approved | v1.5.3 |
UMSO Method Statement (redlined) | METH009 | Method Statements | Approved | v5.2 |
D0192 - Readings and Settings from a Token or Key Meter | REC Solution Document | Approved | 1.0 | |
Change of Supply Business Process Descriptions | BPD001 | Business Process Descriptions | Approved | v5.1 |
Change of Service - Metering Service Business Process (redlined) | BP002 | Business Process Diagrams | Approved | v5.3 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Approved | v1.7.2 |
MHHS Impacts to BSC Owned Data Flows Comments Log | MHHS-DEL1509 | Unclassified | Approved | 1.0 |
Change of Supply - Forward Migration | DEL-968 | Unclassified | Approved | v1.0 |
Migration Design Document (redlined) | DEL961 | Supporting Document | Approved | v1.3 |
Functional Non-Functional Requirements | DIP002 | Technical Design | Awaiting Approval | v2.0 |
Change of Service - Data Service - Reverse Migration | DEL967 | Unclassified | Approved | v1.1 |
Change of Data Service Business Process Descriptions (redlined) | BPD003 | Business Process Descriptions | Approved | v5.1 |
LSS Method Statement | METH005 | Method Statements | Approved | v5.0 |
End to End Non Functional Requirements (redlined) | E2E002 | Technical Design | Approved | v3.1 |
End to End Non Functional Requirements (redlined) | E2E002 | Technical Design | Approved | v3.3 |
ISD Entities | EDI021 | Supporting Document | Approved | v5.5 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.5.5 |
D0397 - MHHS Supplier Half Hourly Demand Report | D0397 | BSC Solution Document | Approved | 1.2 |
IF-005 Use Case Guide | DES229 | Supporting Document | Approved | v1.3 |
ADS Validation Estimation Method Statement | METH002 | Method Statements | Approved | v5.1 |
Change of Connection Type and/or Market Segment Business Process (redlined) | BP011 | Business Process Diagrams | Approved | v5.3 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
Metering Service Requirements (redlined) | BRS002 | Business Requirements | Approved | v5.5 |
Demand Disconnection Event Business Process Descriptions (redlined) | BPD013 | Business Process Descriptions | Approved | v5.1 |
D0368 - Notification of Agreed or Cancelled Appointment with Customer | REC Solution Document | Approved | 1.0 | |
Supplier BM Unit Report | MM00ddd - Ddddd | Unclassified | Draft | v0.5 |
D0399 - MHHS GSP Group Consumption Totals Report | D0399 | BSC Solution Document | Approved | 1.1 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.2.3 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.8 |
D0403 - MHHS GSP Group Demand Disconnection Totals Report | BSC Solution Document | Approved | 1.0 | |
Change of Service - Metering Service - Forward Migration | DEL963 | Business Process Diagrams | Approved | v1.4 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.4 |
Industry Standing Data Requirements (ECS) | BRS010 | Business Requirements | Approved | v5.1 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.2 |
D0403 - MHHS GSP Group Demand Disconnection Totals Report | D0403 | BSC Solution Document | Approved | 1.1 |
Change of Existing Service Appointment Business Process Descriptions | BPD003B | Business Process Descriptions | Approved | v5.0 |
SDS Validation Estimation Method Statement (redlined) | METH001 | Method Statements | Approved | v5.1 |
D0194 - Request for Installation of Key Meter | REC Solution Document | Approved | 1.0 | |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.7.1 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.2 |
LDSO Overview Requirements | BRS005 | Business Requirements | Draft | v5.1 |
Physical interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.2.1 |
Market-wide Data Service Business Process Descriptions | BPD019 | Business Process Descriptions | Approved | v5.0 |
Data Collection Business Process Descriptions (redlined) | BPD004 | Business Process Descriptions | Approved | v5.1 |
Change of Registration Data Business Process Descriptions | BPD010 | Business Process Descriptions | Approved | v5.1.1 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.7.1 |
Data Collection Business Process | BP004 | Business Process Diagrams | Approved | v5.0 |
ISD Entities (redlined) | EDI021 | Supporting Document | Approved | v5.1 |
IF015-016 Design Note | DIP051 | Technical Design | Approved | v0.2 |
Fast Track Design Review Process | Unclassified | Draft | v1.0 | |
Disconnection Business Process | BP007 | Business Process Diagrams | Approved | v5.3 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Approved | v1.2.2 |
Supplier Overview Requirements | BRS004 | Business Requirements | Approved | V5.2 |
Change of Service - Data Service - Forward Migration | DEL970 | Business Process Descriptions | Approved | v1.1 |
D0397 MHHS Supplier Half Hourly Demand Report | BSC Solution Document | Approved | 1.1 | |
Provisional Transitional Scaling Weights (redlined) | DES240 | Supporting Document | Approved | v1.1 |
Design Interim Release 1 Note | DEL1275 | Release Note | Approved | v1.0 |
Registration Service requirements | BRS003 | Business Requirements | Approved | v5.6 |
Optional SDS MDR Standard Interactions Requirements (redlined) | BRS017 | Business Requirements | Approved | v1.0 |
Interface Catalogue (redlined) | DES138 | Interface Specifications | Approved | v5.5.2 |
D0179 - Confirmation of Energisation De-Energisation of Prepayment Meter | REC Solution Document | Approved | 1.0 | |
Change of Existing Service Appointment Details Business Process | BP003B | Business Process Diagrams | Approved | v5.0 |
Change of Supply - Reverse Migration | DEL-965 | Unclassified | Approved | v1.1 |
Market-wide Data Service Business Process Descriptions (redlined) | BPD019 | Business Process Descriptions | Approved | v5.1 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Approved | v1.5.5 |
Change of Metering Business Process Descriptions (redlined) | BPD009 | Business Process Descriptions | Approved | v5.1 |
Metering Service Requirements (redlined) | BRS002 | Business Requirements | Approved | v5.4 |
Industry Standing Data Business Process Descriptions | BPD021 | Business Process Descriptions | Approved | v5.1 |
Physical Interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Approved | v1.5.3 |
Change of Service - Data Service - Forward Migration | DEL964 | Business Process Diagrams | Approved | V1.4 |
Change of Supply - Reverse Migration | DEL-965 | Business Process Diagrams | Approved | v1.2 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Approved | v1.5.5 |
D0222 - Change in Customer Details | REC Solution Document | Approved | 1.0 | |
Volume Allocation Service Business Process | BP020 | Business Process Diagrams | Approved | v5.2 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Approved | v1.8 |
Physical interfaces - Interfaces - yaml | E2E003 | Technical Design | Approved | v1.3 |
Data Service Requirements (redlined) | BRS001 | Business Requirements | Approved | v5.1 |
IF-005 Use Case Guide | DES229 | Supporting Document | Approved | v1.2 |